EASA Part-IS Audit Guide: Scope, Evidence and Common Gaps

Part-IS requires most EASA-approved organisations to run an information security management system (ISMS) aimed at one thing: information security risks that could affect aviation safety. This guide sets out who it applies to and from when, what the requirements ask for, and how to audit them, point by point, with the gaps internal audits most often miss.

Reviewed 17 November 2026 against the Official Journal texts.

Who Part-IS applies to, and from when

Part-IS is two regulations with almost identical organisation requirements. Which one applies depends on the approval the organisation holds, not on its size or how much IT it runs.
RequirementsApplies toApplies from
Part-IS.D.OR
Annex I to Delegated Regulation (EU) 2022/1645
Part-21 design organisations (Subpart J) and production organisations (Subpart G), except those working only on ELA2 aircraft; aerodrome operators and apron management service providers under Part-ADR.OR16 October 2025
Part-IS.I.OR
Annex II to Implementing Regulation (EU) 2023/203
Part-145 maintenance organisations and CAMOs (except those working only on Part-ML aircraft); air operators under Part-ORO (except those operating only ELA2 aircraft or small single-engine aircraft by day under VFR from and back to the same site); ATOs (except ELA2-only or theory-only); aircrew aero-medical centres; FSTD operators (except ELA2-only); ATCO training organisations and ATCO aero-medical centres; ATM/ANS providers (except those with a limited certificate and declared flight information services); U-space and single common information service providers22 February 2026 (1 January 2026 for the EGNOS provider)
Part-IS.AR
Annex I to Implementing Regulation (EU) 2023/203
Competent authorities, including EASA, for their own ISMS and their oversight of organisations22 February 2026
Both apply to an organisation that holds approvals on both sides, such as a Part-145 that is also a Part-21 production organisation. The requirements are numbered the same way (IS.D.OR.200 and IS.I.OR.200 cover the same ground), so one ISMS can be built to meet both, but the oversight may come from two authorities: design organisations answer to EASA, while a Part-145 usually answers to its national authority.

How Part-IS differs from an ISO 27001 ISMS

Many organisations start from an existing ISO/IEC 27001 system, and that is a sound base: the risk-based structure, internal audit and improvement cycle carry over. Certification alone does not show Part-IS compliance, though. Audit for the points ISO 27001 does not ask for:For the ISO side of an integrated system, see the ISO 27001 evidence guide on our sister site, auditchecklists.org.

What to collect before the audit

Part-IS is document-heavy at the start and evidence-heavy afterwards. Ask for these in advance, then use the audit to test whether they describe what actually happens:
RequirementWhat to ask for
IS.x.OR.250The ISMM (or the cross-referenced part of the exposition), the signed accountable manager statement, and the authority's approval of the initial issue
205(a) and (b)The inventory of elements in scope (activities, services, systems, data) and the list of interfaces with other organisations
205(c) and 210The risk classification scheme, the risk register and the treatment measures with owners and status
215 and 230The internal reporting procedure, the event log, and any reports made to the authority or a design approval holder
220Detection, response and recovery procedures, with the recovery times the organisation has set
235Contracts for any ISMS activity done by others (monitoring, IT management, cloud hosting where it is part of the ISMS)
240Appointment letters, organisation chart, competence and training records, acknowledgements, trustworthiness checks
255 and 260The approved change procedure, recent changes, performance indicators and the latest effectiveness and maturity assessment

Scope and interfaces: test the inventory first (205(a), (b))

Everything else in Part-IS hangs off the list of elements exposed to information security risk. If a safety-relevant system is missing from it, it is missing from the risk assessment, the treatment, the detection measures and the reporting. Test the inventory against reality:
  1. Pick two or three core activities (for a Part-145, a base maintenance check; for an operator, dispatch of a flight) and list the systems and data each one depends on, from interviews and a walk-through, not from the inventory.
  2. Compare your list with the inventory. Typical omissions are maintenance data and OEM portals, component and records systems, electronic flight bags, flight planning and mass and balance tools, simulators, and data exchanged with the CAMO or operator.
  3. Check the interface list names the other organisations whose systems or data you rely on, and those that rely on yours, and that risks shared with them have been communicated (210(b)).
Office-IT scope

The inventory lists the office network, email, the ERP system and the website. The interface list is "suppliers: see purchasing".

Activity-led scope

The auditor follows a C-check work package and finds task cards generated from the OEM's online maintenance data, and parts records held in a cloud system run by a third party. Neither appears in the inventory or the interface list. Finding: elements and interfaces with a potential safety impact not identified.

Risk classification and review (205(c), (d))

Check the classification scheme before the register. It must be predefined, take account of the likelihood of the threat scenario and the severity of its safety consequences, and give a clear line between acceptable risks and those that must be treated. Then sample risks and trace each one back to its element or interface.The risk assessment must be reviewed when the elements change, when interfaces or the risks communicated by other organisations change, when the knowledge used to assess risk changes, and after lessons from incidents (205(d)). Ask what changed in the last year (a new system, supplier, base or aircraft type) and look for the review it should have triggered.
What a safety-led risk looks like

A CAMO's register rates "loss of HR data" high and "manipulation of the maintenance programme database" medium, on the grounds that the database is backed up. Reclassified against safety consequences, undetected manipulation of a task interval is the more severe scenario, and a backup does not detect manipulation. The treatment that follows is integrity checking and change logging, not more backups.

Risk treatment (210)

Treatment measures must be implemented in a timely manner and their continued effectiveness checked. For each sampled unacceptable risk, look for three things: the measure, evidence it is in place, and evidence someone has checked it still works. Also check that the measures have not introduced new unacceptable risks, such as a security control that can block access to maintenance data during a check.The appointed Part-IS person(s) and affected staff must be told the outcome of the assessment, the threat scenarios and the measures, and interface organisations told of any shared risk. Ask a line engineer or dispatcher what they were told; the answer is evidence.

Detection, response and recovery (220)

Part-IS asks for measures that spot deviations from predetermined performance baselines and raise warnings, response measures that start a predefined course of action and contain an attack, and recovery measures that bring affected elements to a safe state within a recovery time the organisation has set in advance.

Internal and external reporting (215, 230)

The internal scheme collects and evaluates information security events, decides which are incidents or vulnerabilities with a potential safety impact, finds causes and feeds them back into risk management. Contracted organisations that could expose you to risk must be required to report events to you (215(c)), and you must cooperate on investigations with organisations that contribute significantly to your security (215(d)).Externally, any incident or vulnerability that may be a significant risk to aviation safety goes to the competent authority, and also to the design approval holder if it affects an aircraft or component, or to the designer of a system or constituent you use. There are three stages:
StageWhen
NotificationAs soon as the condition is known to the organisation
ReportAs soon as possible and within 72 hours of the condition being known, unless exceptional circumstances prevent it, in the form the authority defines
Follow-up reportAs soon as the recovery and prevention actions have been identified
This sits alongside occurrence reporting under Regulation (EU) No 376/2014, which still applies. The best audit test is a walk-through: take an event from the log, ideally a borderline one, and follow the decision on whether it was reportable, who made it, when, and on what criteria.
Procedure only

The procedure says "report incidents to the authority within 72 hours". The event log has 40 entries, all closed as "IT issue", and nobody can say who decides what is reportable.

Traceable decision

The auditor picks a phishing compromise of a planning engineer's account. The log shows the safety assessment (no access to maintenance data, so not reportable externally), who decided, the time, and the criteria used. The same record shows the cause was fed into the risk review.

People: the accountable manager and the appointed persons (240)

Trustworthiness is the point most often assumed rather than evidenced. Sample three people with privileged access, including a contractor, and ask for the record of how their identity and trustworthiness were established.

Contracted activities (235)

Accountability stays with the organisation when any ISMS activity is contracted out, whether security monitoring, IT administration or a managed service. The contracted activity must meet Part-IS, the contractor must work under the organisation's oversight, and the competent authority must be able to get access to the contractor on request.Read the contracts. The authority-access clause and the duty to report security events to you (215(c)) are the two clauses most often missing from standard IT and cloud contracts, and neither can be fixed after an incident.

Records (245)

RecordMinimum retention
Approval of a derogation (200(e)) and its risk assessment5 years after the approval has lost its validity
Contracts for ISMS activities5 years after the contract is amended or terminated
Key processes; risks and treatment measures; reported incidents and vulnerabilities5 years
Events kept for reassessment to reveal undetected incidentsUntil reassessed, at a periodicity set in the organisation's procedure
Qualification and experience of staff in ISMS rolesWhile they work for the organisation and at least 3 years after they leave
Records must be protected from damage, alteration and theft, with integrity, authenticity and authorised access ensured. Check the format is specified in a procedure and that the event-log retention matches the reassessment periodicity the organisation set.

The ISMM, changes and continuous improvement (250, 255, 260)

The ISMM must contain, among other things, a statement signed by the accountable manager (and countersigned by the CEO if they are different people), the policy, the named persons and their responsibilities, an organisation chart, the internal reporting scheme and the procedures for contracted activities and amendments. It can be part of an existing exposition if a clear cross reference shows where each Part-IS requirement is met.Changes to the ISMS follow an authority-approved change procedure; anything outside it needs approval before it is implemented. Sample a recent change, such as a new monitoring provider or a reorganisation, and check which route it took.For improvement, the organisation assesses the effectiveness and maturity of the ISMS with performance indicators, on a predefined calendar and after an incident, and reassesses whatever its improvement measures touched. Ask for the indicators and the last assessment; a management review with no indicators does not meet 260.

The derogation is not an exemption (200(e))

An organisation can be approved not to implement most of Part-IS if it shows that its activities, facilities, resources and services pose no information security risk with a potential safety impact, to itself or to others. The approval rests on a documented risk assessment carried out under 205 and approved by the authority, and it is reviewed every oversight cycle and whenever the scope of work changes.Two duties remain even with an approval: occurrence reporting under Regulation (EU) No 376/2014, and protecting the confidentiality of information received from other organisations (200(a)(13)). If an organisation says it is "exempt because we are small", ask for the approval. Without one, every requirement applies.

Where Part-IS audits most often fall short

Each of these is found by tracing a link (activity to system, risk to measure, event to decision, contract to clause) rather than by confirming a document exists. Trace the links and you will find what the competent authority finds.

The audit checklists

This guide is the method. The checklists apply it to every paragraph of the rule: each IR, AMC and GM provision as an audit question, with suggested evidence. The free sample and the Compliance Matrix on each product page show the coverage before you buy.

Sources